Clubhouse Construction Photos Update 08/24/2016

By Tabitha Golt, in Uncategorized
  • Building MEP complete
  • Building A/C on
  • Drywall 75% complete on the main floor
  • Trim work 75% complete on the lower floor
  • Bathroom tile for lounges complete
  • Door installation for the lower floor complete
  • Elevator installation on-going
  • Painting for the lower floor at 80% completion
  • Wine room ceiling installation complete
  • Commenced installation of wine room beams
  • Simulator room prep on-going
  • Kitchen walls have been installed and waiting on equipment
  • Kitchen walk-in coolers have been installed
  • Beer cooler downstairs has been installed
  • Main bar prepped and ready for install
  • Cupola has arrived and installation has commenced

Wine Room

Wine Room

Wine Room Ceiling

Wine Room Ceiling Brick

 

Men’s Lounge Showers

Mens Showers

 

Men’s Lounge

Mens Lounge

 

Golf and Tennis Shop

Golf and Tennis Shop

IMG_4165

 

Card Room

Card Room

 

Billiard Room

Billards Room

 

IMG_4155 (2)

IMG_4150

 

IMG_4152