The Careers through Culinary Arts Program or C-Cap was started in 1990 and provides cooking competitions for scholarships, job training and internships, teacher support, college advising, lifetime career guidance, and product donations to classrooms. They work with over 150 public high schools, 220 teachers, and 17,000 students annually. Today, C-CAP operates in seven locations across […]

Clubhouse Construction Photos Updated 11/05/2016

By Tabitha Golt, in Uncategorized

Clubhouse Construction Photos Updated 11/05/2016

Clubhouse Construction Photos Updated 10/19/2016

By Tabitha Golt, in Uncategorized

Clubhouse Construction Photos Updated 10/19/2016 Outside Railings Installed Men’s and Women’s Lockers and Benches installed in Lounges Wine Room Wall Wine Room Lighting Berkshire Hathaway Gallo Rental Department Touring The Peninsula Clubhouse View of the driving range Living Room Ceiling Fans

Clubhouse Construction Photos Updated 10/05/2016

By Tabitha Golt, in Uncategorized

Clubhouse Construction Photos Updated 10/05/2016 Men’s Lockers Site Work Main Dining View Main Dining Fireplace Bar Top Side View View from The Clubhouse of the driving range Women’s Lockers Main Floor Hallway View Side entrance steps Bar

Clubhouse Construction Update, Passing on Praise to Keith, Clothing our Kids Upcoming Events, Entertainment Venue Coming to Sussex County

By Tabitha Golt, in Uncategorized

WELCOME TO FALL!!!   While Summer may be winding down, for those of us who are fortunate enough to be able to experience The Peninsula at this time of year.. enjoy! The leaves are about to start changing, the days will get shorter, and mornings will grow chillier as the warmth of summer fades away. […]

Clubhouse Construction Photos Updated 09/28/2016

By Tabitha Golt, in Uncategorized

Clubhouse Construction Photos Updated 09/28/2016 Drywall at 90% 1st floor complete Carpet install to commence Pro shop ready for fixtures Cart barn charger system installed – ready for chargers Service elevator installed Passenger elevator at 75% Cupolas installed Lightning protection installed Soda lines have been run Beer lines to commence this week Interior natural stone […]

Clubhouse Construction Photos Updated 09/21/2016

By Tabitha Golt, in Uncategorized

Clubhouse Construction Photos Updated 09/21/2016                

Clubhouse Construction Photos Updated 09/07/2016

By Tabitha Golt, in Uncategorized

Clubhouse Construction Photos Updated 09/07/2016

The Peninsula Clubhouse Construction Photo Update 08/31/2016

By Tabitha Golt, in Uncategorized

The Peninsula Clubhouse Construction Photo Update 08/31/2016

Clubhouse Construction Photos Update 08/24/2016

By Tabitha Golt, in Uncategorized

Building MEP complete Building A/C on Drywall 75% complete on the main floor Trim work 75% complete on the lower floor Bathroom tile for lounges complete Door installation for the lower floor complete Elevator installation on-going Painting for the lower floor at 80% completion Wine room ceiling installation complete Commenced installation of wine room beams […]